Shipping and Returns
Europe, UK: Friday, May 1
USA: Wednesday, Apr 29
Australia: Thursday, Apr 30
Asia: Wednesday, Apr 29
UAE: Thursday, Apr 30
Order within 4 Hours 58 mins with Scheduled Delivery. If you place an order within this time, We will ship on Monday, Apr 27 2026. This delivery time is calculated by DHL & Fedex. You can check the exact delivery date on checkout page.
USA: Wednesday, Apr 29
Australia: Thursday, Apr 30
Asia: Wednesday, Apr 29
UAE: Thursday, Apr 30
Order within 4 Hours 58 mins with Scheduled Delivery. If you place an order within this time, We will ship on Monday, Apr 27 2026. This delivery time is calculated by DHL & Fedex. You can check the exact delivery date on checkout page.
Reembolso total se não for genuíno. Reembolso total ou parcial, se o novo item não for como descrito.
Protecção do Comprador
Avaliacao do cliente (0 rating)
Nenhuma avaliacao sobre este item...
Descricao (401 characters)
Gear ratio: 8.1
Maximum drag force (kg): 5.0
Own weight (g): 255
PE [Tanattle] Thread winding amount (No.-m): 0.8-400, 1-330, 1.5-200
Maximum hoisting length (cm / handle 1 rotation): 81
Spool dimensions (diameter / width) (mm): 32/22
Spool second winding line: 1/3, 2/3
Number of bearings BB / roller: 8/1
Handle length (mm): 55
Maximum drag force (kg): 5.0
Own weight (g): 255
PE [Tanattle] Thread winding amount (No.-m): 0.8-400, 1-330, 1.5-200
Maximum hoisting length (cm / handle 1 rotation): 81
Spool dimensions (diameter / width) (mm): 32/22
Spool second winding line: 1/3, 2/3
Number of bearings BB / roller: 8/1
Handle length (mm): 55










