Shipping and Returns
Europe, UK: Friday, May 1
USA: Wednesday, Apr 29
Australia: Thursday, Apr 30
Asia: Wednesday, Apr 29
UAE: Thursday, Apr 30
Order within 3 Hours 44 mins with Scheduled Delivery. If you place an order within this time, We will ship on Monday, Apr 27 2026. This delivery time is calculated by DHL & Fedex. You can check the exact delivery date on checkout page.
USA: Wednesday, Apr 29
Australia: Thursday, Apr 30
Asia: Wednesday, Apr 29
UAE: Thursday, Apr 30
Order within 3 Hours 44 mins with Scheduled Delivery. If you place an order within this time, We will ship on Monday, Apr 27 2026. This delivery time is calculated by DHL & Fedex. You can check the exact delivery date on checkout page.
Buyer Protection
Full refund if not genuine. Full or partial refund, if the new item is not as described.
Customer Reviews (0 rating)
No reviews on this item...
Description (412 characters)
Gear ratio: 5.3 / Maximum drag force (kg): 15.0 / Own weight (g): 700 / Maximum hoisting length (cm/handle rotation): 70
Thread amount: PE [Tanatl] (No.-m) 3-400, 4-300, 5-230 / Fluoro (No.-m) 5-250, 6-200
Spool dimensions (diameter/width) (mm): 42/34
Spool lower winding line PE (No.-m): 3-300
Number of bearings (BB/roller): 14/1 / Handle length (mm): 70
Thread amount: PE [Tanatl] (No.-m) 3-400, 4-300, 5-230 / Fluoro (No.-m) 5-250, 6-200
Spool dimensions (diameter/width) (mm): 42/34
Spool lower winding line PE (No.-m): 3-300
Number of bearings (BB/roller): 14/1 / Handle length (mm): 70









